Hello! Welcome to Jiangsu Zhongwei Measurement and Control Instrument Co., Ltd.

Ball valve plug in the electromagnetic flow meter

1插入式电磁流量计(球阀)01.jpg
1插入式电磁流量计(球阀)02.jpg
  • 1插入式电磁流量计(球阀)01.jpg
  • 1插入式电磁流量计(球阀)02.jpg
Ball valve plug in the electromagnetic flow meter by means of cylindrical structure, its processing …

Description:

Products overview:
ZW - LDEC seriesBall valve plug in the electromagnetic flow meterIs in the pipeline on the basis of electromagnetic flowmeter developed a new type of cheap installation of flow meters.That retain the advantages of the pipeline electromagnetic flowmeter and electromagnetic flowmeter in the pipeline for pipeline installation difficulties, such as large cost shortcomings were improved.It is according to the principle of magnetic (NIKURADS), Mr Khoja, by measuring the average flow velocity of the fluid with electromagnetic method, to obtain the volume of fluid flow.Especially used for pressure hole, after installation technology, makes the plug-in electromagnetic flowmeter can install in without water, can also be in cast iron pipe, cement pipe installed.Can say, the successful development of plug-in electromagnetic flowmeter for fluid flow detection provides a new means.
Second, the working principle:
ZW - LDEC seriesBall valve plug-in electromagnetic flowmeter based on Faraday electromagnetic induction principle, with the sounding pipe axis and the magnetic field lines in the vertical tube wall installed on a pair of detecting electrodes, when conducting liquid along the measuring tube axis movement, conductive liquid cutting lines of magnetic force induced electric potential, the induction electric potential by two detection electrodes detection, numerical size and flow into a direct ratio, its value is: E = KBVD type:
E - induction electric potential;
K - factor related to the magnetic field distribution and the axial length;
B - magnetic induction intensity;
V - conductive liquid average flow velocity;
D - electrode gap;(the measuring tube diameter)
Sensor will be induced potential E as traffic signal, sent to the converter, amplifying, transform filter with a series of digital processing, USES dot matrix LCD display with backlight instantaneous flow and cumulative flow.Converter has 4 ~ 20 ma output, alarm output and frequency output, and is equipped with RS - 485 communication interface, and supports HART and MODBUS protocol.

Applications:
ZW - LDEC seriesBall valve plug-in electromagnetic flowmeter is mainly used to measure volume flow of conducting liquid and slurry in the closed pipeline.Including acid, alkali, salt and other corrosive liquids.The products are widely used in petroleum, chemical, metallurgical, textile, food, pharmaceutical, paper making industries and environmental protection, municipal administration, water conservancy construction and other fields.
Four, the main features:
1, corrosion resistant stainless steel material ABS mold production all probe has simple structure, strong, no moving parts, long service life:
2, reliable measurement, strong anti-interference ability;
3, small volume, light weight, small volume, convenient installation and maintenance;
4, large measuring range, the measurement is not affected by temperature, density, pressure, viscosity and conductivity change impact;
5, the pressure loss is zero;
6, can in the case of continuous flow for installation, disassembly, maintenance has brought convenience for users.
7, the general manufacturing cost and the low cost of installation, especially suitable for large and medium diameter pipe flow measurement.

Five, the technical parameters:

1, the nominal diameter: DN80 - DN2200: ZW - LDEC series;

2, flow direction, is, and net flows;

3, range: 150:1;

4, repeatability error: measurements of + / - 0.1%;

5, precision grade: : 0.2, 0.5, 1.0;

6, the temperature measured medium:

Ordinary rubber lining: - 20 ~ + 60 ℃;

High temperature rubber lining: - 20 ~ + 90 ℃;

Ptfe lining: - 30 ~ + 100 ℃;

High temperature type vinyl liner: - 30 ~ + 180 ℃;

7, rated pressure: 0.6-40 mpa;

8, measuring range, the flow measurement range convection velocity range is 0.3-15 m/s;

9, conductivity range: be flow conductivity 5 mu s/cm or more, most of the ingredients in water medium, its conductivity within 200-800 mu s/cm, all can choose electromagnetic flow;

10, output current and load resistance: 4 ~ 20 ma full isolation load resistance < 750 ohms pulse frequency 0 and 1 KHZ photoelectric isolation OCT external electrical conduction 35 v or less collector z large current of 25 ma;

11, electrode materials: molybdenum stainless just, titanium (Ti), tantalum (Ta), hartz alloy (H), platinum (Pt) or other special electrode materials;Protection grade: diving type: IP68, other type IP65;

12, power supply: 85 ~ 265 v, 45 ~ 63 hz;

13, straight pipe length: pipeline: p 5 dn, upstream or downstream 2 dn.

14, connecting method: adopt flange connection between meter and piping, flange connection size shall comply with the terms of GB9119-88;

15, working power: an external ac 220 v, 24 v dc converter, the built-in battery options;

16, riot marks: EXdllBT4;

17, environment temperature: 25 ℃ ~ + 60 ℃;

18, relative humidity: 5% ~ 95%;

19, the total power consumption: less than 20 w.

Sixth, the product installation requirements:

1, the choice of the installation environment:
A, should as far as possible away from strong electromagnetic field devices, such as big motor, transformer, etc.
B, the installation place should not have a strong vibration, pipe fixation.The environment temperature should be changed.
C, installation environment should be easy to install and maintain.
2, installation location choice:
A, always with the current position must ensure that the pipe body.
B, and the choice of fluid flow pulse small place.That should be far away from the pumps and valves, elbow and other local resistance.
C, measuring dual phase (solid, liquid or gas, liquid) fluid, should choose the place is not easy to cause phase separation.
D, should avoid to appear negative pressure at site.
E, easy be side pipe diameter or circumference measurements, and ovality should be smaller.
3, straight pipe length:
Sensors installed pipe straight pipe upstream side length should be greater than or equal to 10 d, downstream should be not less than 5 d.D for pipe size to be tested.
4, flow control valve and regulating valve:
Flow control valves should be installed in the sensor on the upstream side of pipe to be tested, flow control valves should be installed downstream of the sensor in side.Measurement, usually flow control valves should be in the fully open position.
5, installation pedestal welding requirements are as follows:
A, the axis of the install base 63 pipe with pipe axis perpendicular to be tested.The Angle is 90 °
B, using electrode welding.Guarantee after welding flange end face parallel to the pipe axis, weld a solid, can withstand the pressure 1.6 Mpa no leakage phenomenon.
C, measured pipe hole size and install the base hole diameter.

6, installation method:
A, vertical installation: sensors should be inserted into the pipe and pipe section vertical diameter less than 5 ° Angle, suitable for measuring the pipeline vibration small cleaning medium.
B, tilted installation: its the axis of the sensor and the axis of the pipeline under test Angle 45 °, is fit for measuring the medium or big diameter and other impurity is contained in the liquid flow measurement, small resistance of the installation of water, should not be bound to hang.
C, plug-in electromagnetic flow sensor insertion point there are two ways: one is inserted into the pipe to be tested on the central axis, the second is inserted into the pipe wall for the pipe of 0.25 D.
7, the installation of sensors:
A, clean up the measured pipe installation pedestal welding slag and burr.
B, turn off the upstream flow control valves or low pressure water supply.
C, will be installed (ball valve to the base.Pay attention to the the sky cavity up ball valve, check valve to fully open, fitted to press the compression screw, nut and rubber seal installed onto the ball valve.Loosen the nut.Insert the sensor rod through the ball valve is inserted into the pipe to be tested, at the same time should pay attention to the sensor direction pointing to the antenna should work in harmony with the direction of flow.

Seven, notable matters of installation:
1, the sensor should be installed vertically, and fluid flows from bottom to top, in order to meet the solid and liquid two is in a state of mixed.The reason is that if there is solid in the medium (sand, gravel particles, etc.) are prone to precipitation.Have fish and weeds in another line of fish swimming in the pipeline, will cause the flowmeter output swing;Hang back and forth near the electrode weeds can also cause the output of the meter is not stable.Set at the entrance of upstream flow meter metal screen blocking fish and weeds into the measuring tube.
2, to prevent the negative pressure pipe set improper operation will cause negative pressure sensor inside.When closed, downstream of the valve in the flow meter at the same time, if the temperature is higher than the temperature of the fluid.Contraction after cooling, the pipe pressure is in danger of forming negative pressure.The negative pressure caused by the lining and metal vessel, cause leakage electrode.
3, near the flowmeter and negative pressure to prevent valve, open the valve on atmospheric pressure, in order to prevent to produce negative pressure in the sensor.Downstream by a vertical line, if use flow upstream of the valve to close or adjusting flow sensor, the sensor will form a negative pressure measuring tube.In order to prevent negative pressure, need to add back pressure or use downstream to adjust and close the flow valve.
4, proper maintenance space, large diameter flowmeter are often installed in instrument well, for pipe installation, wiring, inspection and maintenance convenience, need to have the appropriate space.For observation, connection and maintenance convenience, instrument installation should have a certain height from ground, in order to facilitate cleaning, installation.

Eight, selection of parameters:
For ZW - LDEC series, the design unit should according to the main technical indicators, with reference to the actual situation of the user selection.
1, the determination of suitable flow range:
If the user pipeline has been completed, can choose according to table phase for traffic and sensor calibration.
If the user is not well pipe, first of all, sensor size should be determined according to the flow range to consider is equipped with cut-off valve type and installation without a stop valve type sensor.
2, pressure and usage:
User can choose according to the requirement of the pipeline pressure sensors of pressure index, general plug-in electromagnetic for special occasions requiring small pipe pressure, suitable for large and medium-sized circulating water in the pipe, the source water and water metering.In addition, the LDC plug-in electromagnetic flowmeter with diameter of an organic whole, cheaper than electromagnetic flowmeter.
3, probe and insertion rod form:
Probe form is determined according to the situation of medium suspension, generally suspended matter how not easy disassembling often choose open, otherwise choose catheter type. Insert the pole form is for installation requirements. General screw is easy to install.

Nine, reference flow range:

CALmm

Flow rangem3/h

CALmm

Flow rangem3/h

Phi is 15

0.06 ~ 6.36

Phi 450

57.23~5722.65

Phi 20

0.11~11.3

Phi 500

70.65~7065.00

Phi is 25

0.18~17.66

Phi 600

101.74~10173.6

Phi 40

0.45~45.22

Phi 700

138.47~13847.4

Phi 50

0.71~70.65

Phi 800

180.86~18086.4

Phi 65

1.19~119.4

Phi 900

228.91~22890.6

Phi 80

1.81~180.86

Phi 1000

406.94~40694.4

Phi 100

2.83~282.60

Phi 1200

553.90~55389.6

Phi 150

6.36~635.85

Phi 1600

723.46~72345.6

Phi 200

11.3~1130.4

Phi 1800

915.62~91562.4

Phi 250

17.66~176.25.

Phi 2000

1130.4~113040.00

Phi 300

25.43~2543.40

Phi 2200

1367.78~136778.4

Phi 350

34.62~3461.85

Phi 2400

1627.78~162777.6

Phi 400

45.22~4521.6

Phi 2600

1910.38~191037.6

Ten, selection of code:

model

CAL

(wei tt&c) material: nodular cast iron and stainless steel

ZW-LDEC

150 ~ 2000

Code name

Type of installation

Y

one-piece

F

Split type

Code name

Converter form

ZA

Circular converter

ZB

Square converter (only applicable to split type)

Code name

Power supply form

AC

(communication)220V AC 50Hz(90~245V AC 50Hz)

DC

(dc)24V DC (20~36V DC)

LD

Lithium batteries (with no signal output)

Code name

The output signal

I

4~20mA

F

frequency 1KHz

Rs

Serial communication (485)

C

Control the output

Code name

Explosion-proof requirements

N

No explosion-proof

EX

Explosion-proof (only applicable to split type)

Code name

Whether or not to bring a ball valve

N

Without a ball valve

Q

With ball valve

Code name

The electrode material

316L

Stainless steel

Code name

Wiring (applicable to split type)

10

with10Lead (standard)

15

with15M lead

And so on

Eleven, design selection and ordering information:

1, the measured medium: name, composition, status, electrical conductivity and electrical conductivity;

2, working temperature (℃);

3, work pressure (Mpa);

4, the pipe diameter (DN), the smallest, normal, scope of quantity (m3 / h);

5, corrosion resistance, wear resistance, whether there is a negative pressure;

6, installation requirements and the environment: a body or fission, signal output, communications, power supply;

7, installation environment: protection grade and explosion-proof requirements.

After-sales service commitment:

1, from the date of signing of the contract, I in the way provided for products of the company offers free maintenance and maintenance service, commitment to lifelong maintenance service;

2, jiangsu wei measurement and control instrument co., LTD. Sales manager will be in regular contact with customers, understand the usage of products, and solve the problems of the customers to use in the process of produce, free of charge to provide technical support;

3 the man-made damage is found, the warranty period, our company is responsible for the maintenance, and the resulting maintenance fee;

4, product quality problems or are not satisfied with product, the user can choose unconditional return, wei tt&c don't charge any fees, appear quality problem, bear the freight back and forth.

Browse:
Return To The Top

分享到: